Download C - Electrical Quality Control Plan - March 2013 PDF

TitleC - Electrical Quality Control Plan - March 2013
TagsSpecification (Technical Standard) Electrical Wiring Duct (Flow) Cable Electrical Connector
File Size299.3 KB
Total Pages36
Document Text Contents
Page 18

City of Peterborough
Quality Control Plan –Electrical

Page 18

Inspection Stage
Pre-installation
Installation

Check List for Poles

Contract No: Item No.:

Identification of Poles Inspected:

Type of Inspection Date of
Inspection

Meets
Criteria

Notes

Material has been supplied as per the
contract specifications.

Pole foundations and poles are installed
to the correct elevation, station and offset.

Poles have no dents, scratches or other
imperfections.

All poles have been properly installed,
poles are plumb and anchorage
assemblies and frangible bases (where
applicable) are installed and tightened in
compliance with contract requirements.

Pole handholes are properly oriented.

Contractor:

Inspected By:

Date:

Page 19

City of Peterborough
Quality Control Plan –Electrical

Page 19

Inspection Stage
Pre-installation
Installation

Check List for Footings and Pads

Contract No: Item No.:

Identification of Footings Inspected:

Type of Inspection Date of
Inspection

Meets
Criteria

Notes

Anchorage assemblies are properly
oriented and tested to ensure they are in
working order.

Concrete pads and footings have been
oriented as per contract documents.

All footing and pad elevations are level
and in conformance with project
requirements.

Finished surface of the concrete has been
visually inspected for deficiencies.

Contractor:

Inspected By:

Date:

Page 35

The above noted inspection is hereby certified by

, P.Eng.

P.Eng. Stamp

City of Peterborough
Quality Control Plan –Electrical

Page 35

Proof of Performance Certficiate for Traffic Signal Controller

Contract No: Item No.: Date:

Description:

Identification of Chambers Inspected:

Type of Inspection Meets Criteria

All components have been tested and proven as indicated in the contract.

Cables are energized and in working order without activating the traffic
signals for public display.
Cables have been visually inspected to ensure that all wires are properly
secured and terminated correctly.
Controller has been visually inspected to ensure that controller and conflict
monitor programming is installed correctly.

Setting of timing controls, switches and programming controls is correct.

Conflict monitor was tested.

Prior to turn-on, the intersection was flashed out.

Loop detectors were tested and are as specified in the contract.

Notes:

Inspected By:

Date:

Page 36

City of Peterborough
Quality Control Plan –Electrical

Page 36

Proof of Performance Testing for Loop Detectors

Contract No: Item No.: Date:

Description:

Identification of Chambers Inspected:

Loop No. Location Inductance (H) Resistance (Ohms)

Notes:

Inspected By:

Date:

The above noted testing was witnessed and is hereby

certified by , P.Eng.

P.Eng. Stamp

Similer Documents