Download Ncr 5877 PDF

TitleNcr 5877
File Size1.8 MB
Total Pages74
Table of Contents
                            NCR 5877 Personas ATM, Site Preparation
Federal Communications Commission (FCC) Radio Frequency Interference Statement
Revision Record
About This Document
	Preface
Table of Contents
	Contents - Chapter 1 - Planning Check List and Installation Accessories
	Contents - Chapter 2 - Physical Requirements
	Contents - Chapter 3 - Electrical Requirements
	Contents - Chapter 4 - Installation Site Environmental Requirements
	Contents - Chapter 5 - Decals
	Contents - Appendix A - Transient Protection
	Contents - Appendix B - Power Protection
Contents - Chapter 1 - Planning Check List and Installation Accessories
	Planning Check List
	Installation Accessories
Contents - Chapter 2 - Physical Requirements
	Overview
	Customer Responsibilities
	Product Identification
	Packaging Dimensions
	Terminal Dimensions
	Installation And Service Clearances
		Securing Bolt Location Points
		Securing Bolts
		Floor Covering
		P77 Location
		Weight and Floor Loading
	Access For All
		Heights To Main Facia Items
		Recommended Wheelchair Clearance
Contents - Chapter 3 - Electrical Requirements
	Power Quality Distribution And Grounding Requirements
		AC Requirements
		Input Voltage Setting
		Power Cable
		Grounding Requirements
		Transient Power Loss
		EMI Susceptibility
		EMI Emission
	Communications Requirements
		High Order Communications Cables
		Alarm Interface Cable
Contents - Chapter 4 - Installation Site Environmental Requirements
	Environmental Requirements
		Temperature And Humidity
		All Environments
		Barometric Pressure
		Heat Dissipation
		Air Flow
		Temperature Rise
		Acoustical Noise
Contents - Chapter 5 - Decals
	Decal Specifications
		Card Accept
		Card Orientation Decal
		Exit/Entry Slot Decals
Contents - Appendix A - Transient Protection
	AC Power Line Transient Protection
	Data Line Transient Protection
Contents - Appendix B - Power Protection
	NCR Power Protection and Cabling Products
		AC Power Line Transient Protection
		Data Line Transient Protection
		Uninterruptible Power Supplies
		Contact Information
Index
	A
	C
	D
	E
	F
	G
	H
	I
	L
	N
	P
	R
	S
	T
	U
	W
User Feedback Form
                        
Document Text Contents
Page 1

5877 Personas ATM

Site Preparation

1468 mm(57.8 in.)

1490 mm(58.66 in.)

715 mm(28.15 in.)

472 mm(18.58 in.)

1335 mm(52.56 in.)

272.5mm

(10.7in.)

16mm

(0.6in.)

5mm

(0.2in.)

37.5mm

(1.5in.)

16mm

(0.6in.) 5mm
(0.2in.)

Front of Terminal

Rear of Terminal

426mm

(16.8in.)

120mm

(4.7in.)

Publication ID: B006-6208-A000

Date: 1101

Book.bk Page 1 Tuesday, November 6, 2001 2:04 PM

Page 37

Electrical Requirements
Power Quality Distribution And Grounding Requirements

Book.bk Page 3 Tuesday, November 6, 2001 2:04 PM
Grounding
Requirements 3

The P77 operates from a single phase 3 wire supply; live, neutral
and ground. The power requirements of this unit will normally
permit it to operate within existing wiring configurations and from
existing branch mains outlets with the following provisions:

1 If this supply is provided from a general purpose distribution
panel, the other branch circuits from this panel must not be
used to support heavy inductive loads such as air conditioners,
elevators, microwave ovens, and so on. Nor may such
equipment be operated on the same branch circuit as the P77.

2 If using distribution panels, all branch circuit grounding
conductors must be connected to an insulated terminal strip in
the distribution panel. The grounding conductor from the
distribution panel to the building ground point must be at least
equal in size to the power conductor necessary to supply the
NCR system.

Note: The building ground point can affect data integrity. For
additional information refer to the ‘Data Line Transient Protection’
section of Appendix A.

Transient Power
Loss 3

The voltage loss due to power interruptions must not be more than
50% of the nominal value for a maximum of one half cycle at a
maximum rate of 1 every 10 seconds.

EMI Susceptibility 3
The P77 meets NCR CES-2-11-09 and CES-2-11-10 (details available
on request).

EMI Emission 3
The P77 meets FCC Class A and FTZ VDE 0871/0875 requirements
for radiated and conducted emission.
P77 ATM - Site Preparation 3-3

Page 38

Electrical Requirements
Communications Requirements

Book.bk Page 4 Tuesday, November 6, 2001 2:04 PM
Communications Requirements 3

Voltage transients, line noise, surges, sags, impulses, and spikes
may be experienced routinely or sporadically. When such
phenomena occur, the use of protective devices, as described in
Appendix A, may be required to ensure proper operation of the
equipment.

It is the responsibility of the customer to assure that all installation
preparations are complete and in compliance with NCR
specifications and requirements and with all national, state or local
telephone and telegraph regulations and laws.

High Order
Communications
Cables 3

The high order communications cable type depends upon the
communications system to be used.

Note: Communications cables are not supplied with the P77. If
these cables are required, it is the customer’s responsibility to have
them installed.

All communications cables are routed through the back of the P77,
underneath the module tray to the PC core.

High Order Communications Standard Cable (RS-232) 3

The standard high order communications system supports most
common bit and byte orientated disciplines (synchronous and
asynchronous) with an RS-232 interface.
3-4 P77 ATM - Site Preparation